Broadsound Solar Farm and Battery
Broadsound Solar Farm
368 MWdc
Installed Capacity
634,000
Number of panels
~115,000
Number of homes powered
Broadsound Battery
180 MW / 360 MWh
Capacity
Location
Adjacent to the Broadsound Solar Farm substation
~25,000
Number of homes powered annually
The Project
Broadsound Solar Farm and Battery is located on Barada Kabalbara Yetimarala People land in Central Queensland’s Renewable Energy Zone, approximately 150 km north west of Rockhampton.
The 368 MWdc Solar Farm will comprise of 634,000 solar panels over an area of approximately 900 ha. New entranceways will be created on Marlborough Sarina Road and there will be access tracks created inside the project area for construction and operational activities. The project will be grid connected at Powerlink’s existing Broadsound substation. The Broadsound Battery will be located adjacent to the solar farm substation, within the existing project site.
A temporary construction camp has been constructed on site to house up to 500 workers during the construction phase.
The project has received Development Approval from Isaac Regional Council and received a ‘not a controlled action’ referral decision under the Environment Protection and Biodiversity Conservation Act 1999.
Construction works for the project began in early 2024.
Work with us
We are always interested in hearing from local and regional suppliers. If you would like to be added to our suppliers list, please email us at broadsoundsolarfarm@iberdrola.com.au
Quick Links
Project Documents
Broadsound Solar Farm Gallery
You must obtain Iberdrola Australia's prior written approval before you publish, reproduce or distribute the images in this gallery. If you'd like to do so, please contact media@iberdrola.com.au